Navigation
News
|
 |
Statutory Instrument 1989 No. 87
The A483 Swansea-Manchester Trunk Road (Improvement at Bryn Sadwrn) Order 1989
(The document as of February, 2008. Arhiv.Online Library)
-- Back--
STATUTORY INSTRUMENTS
1989 No. 87
HIGHWAYS, ENGLAND AND WALES
The A483 Swansea-Manchester Trunk Road (Improvement at Bryn Sadwrn) Order 1989
<<<< >>>>
Coming into force | 1st March 1989 |
The Secretary of State for Wales makes this Order in exercise of powers conferred bysection 10 of the Highways Act 1980[1], and of all other enabling powers: 1. The new highway which the Secretary of State proposes to construct along the route described in the Schedule to this Order shall become a trunk road as from the date when this Order comes into operation. 2. The centre line of the new trunk road is indicated by a heavy black line on the deposited plan. 3. In this OrderAll measurements of distance are measured along the route of the relevant highway: (i) "the deposited plan" means the plan numbered HA10/2 WO35, marked "The A483 Swansea-Manchester Trunk Road (Improvement at Bryn Sadwrn) Order 1989" signed by authority of the Secretary of State for Wales and deposited at the Welsh Office Repository, Curran Embankment, Cardiff; (ii) "the new trunk road" means the highway mentioned in article 1 of this Order; (iii) "the trunk road" means the A483 Swansea-Manchester Trunk Road.
4. This Order shall come into force on 1st March 1989 and may be cited asthe A483 Swansea-Manchester Trunk Road (Improvement at Bryn Sadwrn) Order 1989. Signed by authority of the Secretary of State
J A Morgan
An Assistant Secretary, Welsh Office
18th January 1989
Notes:[1] 1980 c. 66.
-- Back--
<<<< >>>>
|  |
Search
Popular article
Advert
|