Navigation
News
|
 |
Statutory Instrument 1996 No. 142
The Tameside (Ashton Northern By-Pass Stage 1 Ashton-Under-Lyne) (Special Roads) Scheme 1994 Confirmation Instrument 1996
(The document as of February, 2008. Arhiv.Online Library)
-- Back--
STATUTORY INSTRUMENTS
1996 No. 142
HIGHWAYS, ENGLAND AND WALES
The Tameside (Ashton Northern By-Pass Stage 1 Ashton-Under-Lyne) (Special Roads) Scheme 1994 Confirmation Instrument 1996
<<<< >>>>
The Secretary of State for Transport makes this Instrument in exercise of powers conferred by Section 16 of the Highways Act 1980[1], and now vested in him[2], and of all other powers enabling him in that behalf: 1. The Tameside (Ashton Northern By-Pass Stage 1 Ashton-under-Lyne) (Special Roads) Scheme 1994 is hereby confirmed with modifications. 2. The said Scheme as confirmed (hereinafter referred to as "the Scheme") is set out in the Schedule hereto and copies of the Scheme and its accompanying plan are deposited at the offices of the Department of Transport, 76 Marsham Street, London SW1 4DR and at the offices of Tameside Metropolitan Borough Council, Ashton Information Office, Council Offices, Wellington Road, Ashton-under-Lyne, Tameside OL6 6DL. 3. The Scheme will come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980. 4. This Instrument may be cited as the Tameside (Ashton Northern By-Pass Stage 1 Ashton-under-Lyne) (Special Roads) Scheme 1994 Confirmation Instrument 1996. Signed by authority of the Secretary of State for Transport
Pamela Denham
Regional Director, Government Office for the North East
24th January 1996
Notes:[1] 1980 c. 66.
[2] S.I. 1981/238.
-- Back--
<<<< >>>>
|  |
Search
Popular article
Advert
|